300-800mm large diameter PE winding pipe machine
The main technique parameter :
Model | pipe size | Extruder | |||||||||
Model | Length diameter ratio | Motor power | Heating power | ||||||||
SJKRG800 | φ300-800 | SJ90 | 30:1 | 75 | 30 | ||||||
SJ65 | 30:1 | 45 | 18 | ||||||||
SJKRG1200 | φ300-1200 | SJ90 | 34:1 | 110 | 36 | ||||||
SJ65 | 30:1 | 75 | 18 | ||||||||
SJKRG1500 | φ800-1600 | SJ100 | 34:1 | 160 | 36 | ||||||
SJ65 | 30:1 | 75 | 18 | ||||||||
SJKRG2200 | φ1500-2200 | SJ120 | 30:1 | 185 | 60 | ||||||
SJ65 | 30:1 | 75 | 36 | ||||||||
SJKRG3000 | φ2200-3000 | SJ150+SJ90 | 30:1 | 75 | 36 |
Machine list for 200-800mm diameter PE hollow wall winding pipe production line:
Single screw extruder ,model : SJ-90*30 | One set |
Auto drying ,material loading system | One set |
Extruding die head and mould | 200-800mm |
Profile pipe extruding die head | One set |
Mouth mould ,core bar | One set |
Vacuum sizing cooling system | One set |
Sizing sleeve | One set |
Sprinkling cooling system | One set |
Spiral forming machine | One set |
Steel sheet feeding device | One set |
Pipe spiral forming mould | One set |
Melt material extruding machine ,model:SJ-65*30 | One set |
Melt material extruding machine, SJ50*30 | One set |
Cutting device | One set |
Product stacker | One set |
Electricity control system | One set |
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China