Cheapest Price Wpc Profile Production Line - Corrugated pipe machine HDPE/PVC double wall corrugated pipe machine – WOOD-PLASTIC Detail:
Material : HDPE/PVC
Application: instead of concrete pipe and iron pipe
Production process:
Loader--- extruder---Die---Forming moulds---cutter (optional)---Double working station winder (optional)---stacker(optional)
Technique parameter:
HDPE 40-160mm | ||
Model | SJSBWG-110 | SJBWG-160 |
Pipe diameter | 40-110 | 75-160 |
extruder | SJ63/33+SJ65/33 | SJ65/33+SJ90/33 |
Quantity of mould blocks | 72 | 72 |
Forming die | Co extrusion die |
HDPE and PVC | ||
Model | SBWG-110 | SBWG-250 |
Pipe diameter mm | 50-110 | 75-250 |
Extruder model | SJ63/33+SJ65/33 for HDPESJSZ65/132 for pvc | SJ65/33+SJ75/33 for HDPESJSZ80/156 for pvc |
Product detail pictures:
Related Product Guide:
The Insider Scoop on a Vacuum Formable Plastic Sheet
Acrylic Plastic Sheets
No matter new customer or old customer, We believe in long term and trusted relationship for Cheapest Price Wpc Profile Production Line - Corrugated pipe machine HDPE/PVC double wall corrugated pipe machine – WOOD-PLASTIC, The product will supply to all over the world, such as: Uzbekistan, Cambodia, Chile, With top quality products, great after-sales service and warranty policy, we win trust from many overseas partner, many good feedbacks witnessed our factory's growth. With full confidence and strength, welcome customers to contact and visit us for future relationship.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By David Eagleson from Amman - 2017.09.26 12:12
This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
By Lynn from Marseille - 2017.11.12 12:31