China New Product Wood Sticking Machine - Plastic recycling machine PP PE plastic crushing and granulating – WOOD-PLASTIC Detail:
Quotation
Item | Machine | Quantity |
1 | SHJ70 parallel double screw extruder | 1 set |
2 | Hydraulic screen changer | 1 set |
3 | Granulating die head | 1 set |
4 | Cooling tank | 1 set |
5 | Water brace granulating auxiliary machine | 1 set |
6 | Product conveying system | 1 set |
7 | Electricity control system | 1 set |
Product detail pictures:
Related Product Guide:
PVC Pipes Measurements
Why Do People Prefer PVC Pipes For Various Purposes
We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for China New Product Wood Sticking Machine - Plastic recycling machine PP PE plastic crushing and granulating – WOOD-PLASTIC, The product will supply to all over the world, such as: Austria, Angola, Puerto Rico, All of our products comply with international quality standards and are greatly appreciated in a variety of markets around the world. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients in the near future.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Jack from Bolivia - 2018.10.31 10:02
With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
By Iris from India - 2017.10.27 12:12