Lowest Price for China PP PE HDPE Plastic Pipe Production Line / Making Machine

Short Description:

Sticking to the principle of "Super Quality, Satisfactory service" ,We are striving to be a good business partner of you for Lowest Price for China PP PE HDP...


  • FOB Price: US $20,000-100,000/set
  • Min.Order Quantity: 1 set
  • Supply Ability: 10 sets per month
  • Port: Qingdao
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Service and support

    Inquiry and contact

    Product Tags

    Sticking to the principle of "Super Quality, Satisfactory service" ,We are striving to be a good business partner of you for Lowest Price for China PP PE HDPE Plastic Pipe Production Line / Making Machine, All prices depend upon the quantity of your order; the more you order, the more economical the price is. We also offer good OEM service to many famous brands.
    Sticking to the principle of "Super Quality, Satisfactory service" ,We are striving to be a good business partner of you for China Pipe Production Line, Pe Pipe Machine, We are trying our best to make more customers happy and satisfied. we sincerely hope to establish a good long-term business relationship with your esteemed company thought this opportunity,based on equal, mutual beneficial and win win business from now till the future.

    1.Machine introductions for  PP PE PPR pipe production line:
    Application of pe pipe:
    With the PE pipe production line, you can extrude high quality large diameter water and gas supply pipes .This pipes produced by our line have excellent stiffness and flexibility ,resistance to creep deformation ,excellent heat-linkage .Large dismeter HDPE pipes start to play very important role in the city water and gas supply systems.

    Machine advantages of pe pipe production line :
    This line is assembled lattice or spiral mould, new type calibration unit and spraying cooling bath. Advanced PLC control system and large chromatic liquid-crystal screen make the operation more convenient ,having a friendly human-machine interface.

    2. different models of PP PE PPR pipe production line for different diameter:

    Model Diameter(mm) Marking line machine model Max.output(kg/h)
    SJ-65B φ110 SJ-25 90-180
    SJ-90B φ200 SJ-30 200-320
    SJ-120B φ400 SJ-30 320-500
    SJ-150B φ630 SJ-30 550-700

    3, Machine line consists of PE pipe production line:
    The production line consists of control system ,extruder,mould,calibration unit,haul-off unit,planetary cutter and stacker.

    1, Main extruder: single screw extruder

    PP PE PPR pipe machine-extruder

    2, co-extruder: SJ30 extruder for marking line

    PP PE PPR pipe machine-SJ30 extruder

    3, die head: different size may use different die head

    PP PE PPR pipe machine-die head

    4, vacuum cooling tank: 6 meter length

    PP PE PPR pipe machine-water tank

    5, spraying water tank: 6 meter length, for big diameter, we may need to equip 2 sets or 3 sets of spraying water tank

    PP PE PPR pipe machine- cooling tank

    6, haul off machine: for different diameter, we may equip different type of haul off machine, such as double caterpillar type, three caterpillar type, four caterpillar type

    PP PE PPR pipe machine-haulling off device

    7, cutting machine: high quality cutting machine for non-dust cutting

    PE pipe machine (25)

    8. product stacker: 6 meter length

    PP PE PPR pipe machine-stacker



  • Previous:
  • Next:

  • 1, WARRANTY TERMS: 

    1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

    1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

    1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

    2, DELIVERY CONDITIONS:

    2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

    2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

    2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

    3, INSPECTION: 

    WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

    4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

    IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

    If any interest to our machines, please kindly feel free to contact us:

    Email: info@tongsanextruder.com       info@wpcmachinery.com

    Phone: 0086-13953226564
    TEL:0086-532-82215318

    Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • WhatsApp Online Chat !