Massive Selection for Geomembrane Machine - Plastic profile machine PVC ceiling machine – WOOD-PLASTIC Detail:
Total line:
1, Used condition :380—420V/3phase /50HZ |
2, Suitable material:PVC powder and the accessory material (we will supply the formula to you ) |
3, Applicant:PVC window and door profiles |
SJSZ-65/132 conical double screw extruder
Mould and sizing sleeve :
We will supply the mould and sizing sleeve according to the samples . | |
As the samples photos you attached | For the acoustic lining : one mould, cause the final product is big |
For the smaller pieces such as pinch plate , double mould | |
Can produce the pinch plate two pieces together |
vacuum sizing device:
The total length of vacuum sizing device : 6000mm |
Material of water container : stainless steel |
The joint of cooling water pipes : quantity : 20 piecesThe joint of vacuum pipes : quantity : 20 pieces |
Landscape orientation adjustment space :80mm Central height adjustment space :80mmPortrait adjustment space :600mm |
Go forward and recede equipped with auto pushing pole , power : 1.1kw |
Hauling off device:
The maximum clamping width : 300mm The maximum clamping height : 120mm |
Maximum traction : 30000N |
Hauling off speed : 0-5m/min, can be adjusted must be match with extruder |
Motor power :3KW |
With pneumatic fasten adjustment function |
Cutting device:
The diameter of saw blade : 400mm |
Maximum cutting profile : 250mm |
Cutting speed : 5m/s |
Motor power :2.2KW |
storage device
Control system of total line :
Schneider low-voltage electric applicant , OMRON intelligent temperature controller , Siemens speed frequency regulator |
Auxiliary machinery:
SHRL—200/500 material mixing device
Function : To make the PVC powder together with accessory materials |
Total volume : for hot mixing device 200L ; for cold mixing device :500LValid volume : for hot mixing device 150L ; for cold mixing device :320L |
Stirring blade :2 pieces for hot mixing device , 1 piece for cold mixing device |
Material input at one time : 65KG |
Rotary speed of hot mixing stirring blade :475/950 r.p.m Rotary speed of cold mixing stirring blade : 90 r.p.m |
Material mixing time : 6-10 minutesMaterial cooling time :8-12 minutes |
Heating mode : auto friction or electric heatingCooling mode : water circulate |
Motor power : 30/42KW ; capacity : about 350kg/h |
SWP360 crusher:
Moving blade : quantity : 3 piecesFixed blade : quantity :2 pieces |
Diameter of crushing chamber : 360mm Diameter of crushing sieve :10mmDiameter of crushed scrape : 3-5mm capacity : 300-400kg/h |
Motor power : 11kw |
Product detail pictures:
Related Product Guide:
PVC Pipes Measurements
Acrylic Plastic Sheets
We're also concentrating on improving the things administration and QC program to ensure we could maintain terrific gain from the fiercely-competitive company for Massive Selection for Geomembrane Machine - Plastic profile machine PVC ceiling machine – WOOD-PLASTIC, The product will supply to all over the world, such as: azerbaijan, Russia, Dubai, When you are keen on any of our items following you view our product list, please feel free to make contact with us for inquiries. You'll be able to send us emails and get in touch with us for consultation and we shall respond to you as soon as we are able to. If it's convenient, you could find out our address in our web site and come to our enterprise. or additional information of our items by yourself. We're generally ready to build lengthy and steady co-operation relations with any possible shoppers within the associated fields.
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China
By Nina from Estonia - 2017.03.08 14:45
This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
By Nora from Rwanda - 2017.03.28 12:22