The consumer gratification is our primary concentrate on. We uphold a consistent level of professionalism, top quality, credibility and repair for OEM Supply The Hot Selling Zhongmao Pvc Garden Pipe Making Machine, The principle of our business will be to give high-quality products, expert provider, and trustworthy communication. Welcome all pals to place trial get for making a long-term business enterprise connection.
The consumer gratification is our primary concentrate on. We uphold a consistent level of professionalism, top quality, credibility and repair for Pipe Extrusion Machine, Pvc Pipe Making, Pvc Pipe Making Well, Now we have gained a lot of recognition among customers spread all across the world. They trust us and always give repetitive orders. Furthermore, mentioned below are some of the major factors that have played significant role in our tremendous growth in this domain.
50-160mm water supplying PVC pipe machine
Technical parameters
Model | PVC200 | PVC315 | SJ630 |
Main machine mode | SJZ-65 | SJZ-80 | SJZ-92 |
Max. Pipe Diameter(mm) | 50-200mm | 110-315mm | 350-630mm |
Cooling water volume m3/h | 6 | 9 | 13 |
Traction speed | 0.4-3 | 0.4-3 | 0.4-3 |
installment capacity | 95 | 135 | 255 |
Machine pictures:
1, conical double screw extruder for PVC water pipe making machine
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China