PVC pipe machine PVC steel wire reinforced pipe making machine

Short Description:

1. PVC steel wire reinforced hose extrusion line 2.Pipe diameter :32 mm-160 mm 3. Installation power :45 kw or 75 kw 4.Output :120 kg/h or 240 kg/h 5,FOB Qi...


  • FOB Price: US $20,000-100,000/set
  • Min.Order Quantity: 1 set
  • Supply Ability: 10 sets per month
  • Port: Qingdao
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Service and support

    Inquiry and contact

    Product Tags

    1. PVC steel wire reinforced hose extrusion line

    2.Pipe diameter :32 mm-160 mm

    3. Installation power :45 kw or 75 kw

    4.Output :120 kg/h or 240 kg/h

    5,FOB Qingdao price:US $15,000-40,000 / Sets

    PVC 钢丝增强管 (3)   PVC 钢丝增强管 (2)

     PVC 钢丝增强管

    Features of Production line 

    1. It adopts high speed and efficient extruder,ensuring the plasticizing quality and output

    2.Special designed steel wire winding machine makes speed  high and winding even and long production time

    3.Special designed coating die head makes high transparency,even distribution of steel wire,and length adjustable

    4.It adopts imported electrical elements for stable and reliable running

    5.All the control buttons are designed in integrated type for easy operation

     

    Technical Data

     Line Model Extruder Model Production scope Output Total Power 
    GR-63 SJ-65/25 Φ32-63 mm 120 kg/h 45 KW
    GR-160 SJ-90/25   Φ 75-160 mm 240 kg/h 75 KW 

  • Previous:
  • Next:

  • 1, WARRANTY TERMS: 

    1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE

    1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

    1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

    2, DELIVERY CONDITIONS:

    2.1 DELIVERY CONDITION: FOB QINGDAO PORT.

    2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

    2.3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.

    3, INSPECTION: 

    WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.

    4, INSTALLATION AND EQUIPMENT COMMISSIONING: 

    IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.

    If any interest to our machines, please kindly feel free to contact us:

    Email: info@tongsanextruder.com       info@wpcmachinery.com

    Phone: 0086-13953226564
    TEL:0086-532-82215318

    Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China

  • WhatsApp Online Chat !