The customer satisfaction is our primary goal. We uphold a consistent level of professionalism, quality, credibility and service for Reliable Supplier China 2021 HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine, We warmly welcome pals from all walks of lifetime to hunt mutual cooperation and generate a far more outstanding and splendid tomorrow.
The customer satisfaction is our primary goal. We uphold a consistent level of professionalism, quality, credibility and service for China HDPE Pipe Machine, Hdpe Pipe Extrusion Machine, We believe in establishing healthy customer relationships and positive interaction for business. Close cooperation with our customers has helped us to create strong supply chains and reap benefits. Our solutions have gained us widespread acceptance and the satisfaction of our worldwide valued clients.
Material : HDPE/PVC
Application: instead of concrete pipe and iron pipe
Production process:
Loader--- extruder---Die---Forming moulds---cutter (optional)---Double working station winder (optional)---stacker(optional)
Good cooling system
HDPE 40-160mm | ||
Model | SJSBWG-110 | SJBWG-160 |
Pipe diameter | 40-110 | 75-160 |
extruder | SJ63/33+SJ65/33 | SJ65/33+SJ90/33 |
Quantity of mould blocks | 72 | 72 |
Forming die | Co extrusion die |
HDPE and PVC | ||
Model | SBWG-110 | SBWG-250 |
Pipe diameter mm | 50-110 | 75-250 |
Extruder model | SJ63/33+SJ65/33 for HDPESJSZ65/132 for pvc | SJ65/33+SJ75/33 for HDPESJSZ80/156 for pvc |
1, WARRANTY TERMS:
1.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER’S WAREHOUSE
1.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
1.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
2, DELIVERY CONDITIONS:
2.1 DELIVERY CONDITION: FOB QINGDAO PORT.
2.2 DELIVERY TERM: WITHIN 60 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
2.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER CAN ARRANGE FOR SUPERVISION OF LOADING.
3, INSPECTION:
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER’S FACTORY. THE BUYER SHOULD COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER’S FACTORY TO DO THE INSPECTION WORK.
4, INSTALLATION AND EQUIPMENT COMMISSIONING:
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER’S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE.
If any interest to our machines, please kindly feel free to contact us:
Email: info@tongsanextruder.com info@wpcmachinery.com
Phone: 0086-13953226564
TEL:0086-532-82215318
Address: The West End And South Side Of Yangzhou Road,Jiaozhou City,Qingdao,China